CEC
One unified FDAS standard for all flexible demand appliances, instead of a rulemaking per appliance category.
Write the capability into it: read a price, and accept a draw limit from the house, over an open protocol the customer can repoint.
CPUC
Require utilities to publish the price and the capacity limit, via OpenADR 3. The limit ordered in D.26-02-025 has to reach the customer machine-readable, with no enrollment and no intermediary.
Extend the flexible connection tariff beyond PG&E and SCE.
Require every tariff filing to include a URPX rate plan, so any rate becomes a price stream.
Utilities
Publish the limit and the price, via OpenADR 3. A flexible connection the customer signs is worth nothing until the number reaches the equipment in the house.
Require both signals of your suppliers, in the next procurement you write.
Appliance OEMs
Both interfaces. Read a price, accept a draw limit from the house, and let the customer point the server somewhere else.
Ship it now. OpenADR 3 and Matter both do this today, and neither waits on a regulator.