Connected Home Energy Forum · Berlin, 26 October 2026

Electrification with
interoperability

DC Jackson · Grid Coordination · grid-coordination.energy

Electrification creates two problems. Today we are solving one.

Balancing the grid is an economics problem. Protecting the transformer is a physics problem. Both land on the customer's bill. Peak we cannot shift is generation and transmission somebody has to build; a transformer we cannot protect is a street somebody has to dig up.

grid-coordination.energyDC Jackson

One signal cannot do both jobs

A dynamic price A per-customer power limit
What it is What energy costs right now How much power this connection may draw right now
Unit The entire grid One service connection
What it solves Balancing the grid Protecting the transformer
What it does Moves energy across time Caps power, immediately
Without it Nobody has a reason to shift Nothing stops everyone shifting at once

A price is an incentive shared by everyone on the same asset. It cannot stop five houses on one transformer responding to the same number at the same moment. A price is an incentive over a group. A limit is an obligation on one connection.

grid-coordination.energyDC Jackson

WHAT THE DISTRIBUTION NETWORK IS ALREADY DOING

We are already experiencing the transformer problem

  • Voltage rises on a sunny afternoon, and inverters and chargers trip off to protect themselves. The customer sees a fault, not a grid condition.
  • Connections are refused, queued or derated for heat pumps and chargers, because nobody can promise what a house will draw at the worst moment.
  • Capacity is managed by curtailment and by waiting, because there is no signal that tells a connection how much it may take right now.

Every one of these is about protecting the transformer. No signal in use today carries an answer to them.

grid-coordination.energyDC Jackson

The good news: three standards already carry a price

Carries a price today
OpenADR 3 Utility to the customer's own equipment, over the Internet
Matter The Commodity Price cluster, inside the home
EEBUS Time of Use Tariff: "the absolute price SHALL be included", currency per Wh

Tomorrow you will hear from Matter and from OpenADR on exactly this. This half of the problem has an answer.

grid-coordination.energyDC Jackson

RUNNING TODAY

A free, public price server, no account required

  • Real hourly prices, live right now, for two large utilities across their distribution circuits and substations, plus prices computed from published rate schedules.
  • Hourly marginal carbon on the same server, in the same shape. A greenhouse-gas number is price-shaped: a device optimizes against it exactly as it does a price.
  • No authentication, no contract, no enrollment. Open-source home automation receives it and orchestrates the house against it.

price.grid-coordination.energy/openadr3/3.1.0/programs?limit=5
Try it in a browser during the break.

grid-coordination.energyDC Jackson

Three standards already define a capacity limit

An import and export capacity limit for the site
OpenADR 3 A dynamic operating envelope: a schedule of limits, with a default the device falls back to when communications are lost
Matter A power threshold is defined in the Meter Identification cluster. Enhancements under consideration
EEBUS Power Envelope, defined at "the building's grid connection point", import and export, time-varying, with a declared fallback
grid-coordination.energyDC Jackson

Both signals must have a path to the appliance

The appliance should speak both: OpenADR 3, so the grid signal reaches it directly, and Matter, so a home energy manager can carry it over the LAN. Build both, and the customer chooses which one their home uses: run an energy manager, or let each appliance take the signal itself.

grid-coordination.energyDC Jackson

We know how to do this. Now we have to require it.

  • Nothing obliges a device to receive one. Not a standard, not a program, not a procurement.
  • The limit must be on the connection, not the device. Today's programs cap the appliances you enrolled, which leaves the transformer exposed to everything else in the house.

No certification program tests whether a device can receive a limit.

grid-coordination.energyDC Jackson

OF 376 PRODUCTS REGISTERED UNDER THE EU CODE OF CONDUCT

Only 7% built it into the appliance

  • The EU Code of Conduct on interoperability of energy smart appliances declares the communication layer out of scope.
  • The Commission's own evaluation counted 376 registered compliant products.
A vendor proprietary protocol to their own cloud 92.57%
Built into the appliance 6.90%
Dongle 0.53%

These are the Commission's own numbers, about its own rule. Require an open protocol on the appliance itself. Tunnel it back to your own cloud as well if you want to, but the cloud cannot be the thing that satisfies the requirement. Matter is local by construction, which is what makes tomorrow's session worth your attention.

grid-coordination.energyDC Jackson

A CURRENT EVSE CERTIFICATION PROGRAM, SCORED AGAINST SIX TESTS

When everything runs through the aggregator

Test Verdict In the released specification
1. An objective, not operation Not met A Charging Schedule Function with default and dispatch schedules
2. Open all the way to the appliance Not met The open protocol runs only upstream: the charger must have internet access, and connects to "the dedicated server, as described by the OEM". Nothing on the customer's own network can reach it
3. A server the customer chooses Not met A new manager is allowed only after the vendor's cloud has been dark for seven days, and only another upstream manager
4. Direct from the utility Not met Aggregator mediated throughout
5. A limit that holds locally Not met "capacity limit", "import limit", "export limit": zero occurrences
6. The customer who cannot respond Met A local override, which expires every time the vehicle is unplugged
grid-coordination.energyDC Jackson

The customer agrees to the capacity limit, and is paid for it

  • Nobody is telling anyone what they may draw in their own house. A capacity limit is something a customer opts into: accept a cap, and get connected sooner, or cheaper, or get paid for the flexibility.
  • Regulators are already mandating it. California has directed its two largest utilities to establish a standardized tariffed flexible connection.
  • The commercial model is not the gap. The customer signs the agreement, and then nothing tells the equipment in the house what was agreed.

Communicating the limit is the gap. A limit that lives only in a contract is enforced by the customer, by hand, or not at all.

grid-coordination.energyDC Jackson

THE ASK

What you can do next

  • If you build the product: receive both. Read a price, respect a capacity limit, and let the customer point the server somewhere else.
  • If you run the network or the service: publish the limit, and require both of your suppliers.
  • If you write the standard: make both signals conformance-testable. MAY is not MUST.

Why wait for a regulator to mandate it, and then have to react?

Both signals are already defined by existing standards.

Integrate OpenADR 3 and Matter into your products and services now.

grid-coordination.energyDC Jackson

EVERYTHING HERE IS PUBLIC AND FREE

Where to find all of this

The price server price.grid-coordination.energy/openadr3/3.1.0/programs?limit=5
User guide, tutorials, client libraries github.com/grid-coordination
The argument, in full grid-coordination.energy
All the decks grid-coordination.energy/presentations/

No account, no contract, no enrollment on any of it.

grid-coordination.energyDC Jackson